Project description: 
In 2017, Anasuria Operating Company decided to install gas lift capability on one of their wells. AOC considered flexible pipe as well as other pipe options and choose TCP and Airborne Oil & Gas. With order placement in May 2017, the Jumper Spool was installed on the North Sea October 2017. The Jumper Spool has a design life 20 years.

Client quote, October 2017

  • We choose the TCP over competing technologies based on the following key benefits:
  • The TCP is flexible, can be installed by subsea pallet and with that provide a significant reduction in total installed cost
  • The TCP is a non-conducting pipe
  • The delivery time was quick and fitted in a challenging schedule; the fact that the pipe was manufactured on stock de-risked our assessment on meeting delivery time

Key system characteristics

  • Project schedule advantages
  • Manufactured in advance, terminated prior to installation on site
  • Significantly more tolerance in length than rigid pipe
  • No metrology required

Lower cost

  • Reduced fabrication cost
  • Reduced buoyancy cost
  • Reduced transport costs
  • Reduced Installation costs

 

Need more information?

Frits Kronenburg

BD Manager - UK & NL

Contact me